To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

The following question refers to “Letter to John Allan”: Judging by the language of Poe’s letter to John Allan, Poe greatly admired his foster father. was a poo
What is the relationship between work and power
Why would Congress not ratify the SALT II treaty? A. Russia reneged on its part of the treaty. B. The Iranian Revolution stopped the treaty. C. Russian combat t
who were some of the greatest contributors to the harlem renaissance? What changed for the african american community during the harlem renaissance?
We hold these truths to be self-evident: that all men are created equal; that they are endowed by their Creator with certain unalienable rights; that among thes
What is the maximum length possible for her blanket?
I need help with this problems 7 to 14
Las muchachas ____________________ una limonada. bebes bebe bebemos beben
Who set up a five year plan for the operation of the soviet union?
The following characteristics describe which of these? This substance is not uniform in appearance and each part of the mixture contains a combination of differ