medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Hey, need some help reverent A. respectful B. respect C. reply D. to spoil
Two diverging light rays, originating from the same point, have an angle of 5° between them. After the rays reflect from a plane mirror, what is the angle betwe
What are the operation sines that make this statement correct? 3_5_7_18_3=14
which of the following expressions does not equal: the sixth root of 81x^4y^8 a. (3xy^2)^2/3 b. (3x)^2/3y^4/3 c. (3x^2y^4)^1/3 d. cube root of 9x^2y^4
Write a complete reaction of succinic acid and acetic anhydride
let f(x)=2x-3 and g(x)= -x^2-1 find ( g o f) (x)
I just need the equation on how to do it. I'm so lost :'( help please!!!!!!
What was the South’s greatest concern when California applied for statehood?
can u tell me how to solve this promblem 4/7 plus 3/7
wats the 60% off a prize that is $20.00