victorharrell2003
victorharrell2003 victorharrell2003
  • 01-05-2021
  • Computers and Technology
contestada

PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

Nonshielded cable with a 1.5-inch diameter should have a minimum bending radius of A. 1.5 in. B. 12.0 in. C. 3.0 in D. 18.0 in.
a² + b² + ab = 7 b² + c² + bc = 21 a² + c² + ac = 28 ab + bc + ac = ?
what is 2 plus two. please answer quickly
Find the interval in which the function f(x) = |x + 4| is increasing.​
What quadrant is the point (2, -5) in?
Factorise x³ + 2x I can't understand this please give me the answer​
Select the correct answer from each drop-down menu. At chemical equilibrium, the amount of because .
The geometric sequence graphed shows the number of mold spores in a Petri dish per day (please help!)
Rachel Carson: Everywhere was a shadow of death. The farmers spoke of much illness among their families. In the town the doctors had become more and more puzzle
The pressure of a sample of helium is 1.556 atm in a 268.5 mL container. If the container is compressed to 112.4 mL without changing the temperature, what is th