jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

What is the expected number of heads that come up when a fair coin is flipped 10 times?
o (sé / conozco) bien a todos los vecinos.
The tully-fisher relation holds that the _____ a spiral galaxy rotates, the _____ it is.
The zeros for f(x)=x^4-4x^3-9x^2+36x are
An action potential is caused by an influx of which of these ions into the cell
How did the Magna Carta affect the power of the English king? It weakened the king's power. It strengthened the king's power. It closely linked the king's power
You get a bagel for $1.95 and juice for $1.09 . You pay with a 5 -dollar bill. How much change will you get back?
What is 78 million in scientific notation?
Which three lengths could be the lengths of the sides of a triangle? A) 6 cm, 23 cm, 11 cm B) 10 cm, 15 cm, 24 cm C) 22 cm, 6 cm, 6 cm D) 15 cm, 9 cm, 24 cm
What are two ratios that are equivalent to 27:9