hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Help with this math problem!
A.j. is a 16-year-old who has just started soccer practice at school. she complains of increased shortness of breath with exercise, and describes having a hard
What is the probability that a five-card poker hand contains a flush, that is, five cards of the same suit?
Derek wrote the equation s= 0.1t to show how much he was saving each month. The variable s equals the amount Derek saves and t equals derek’s total income. Whic
Oxygen is carried in the blood in two ways. most of it is bound to hemoglobin while the remainder is carried in what form? oxygen is carried in the blood in two
PLEASE HELP!!!30 PTS!!!! Pick one of the pictures above. Describe her w the type of asexual reproduction can help the organism reproduce quickly.
camels can run faster than horses in desert.Why
1/6m=5/8 i can't slove this question 8th Grade Math
In an endothermic reaction, heat is absorbed from the surroundings. How does this affect entropy? A. The particles in the surroundings move slower and have dec
In a survey, 17 high school graduates and 16 non-graduates were asked a qiestion.