sadikshyapoudel015
sadikshyapoudel015 sadikshyapoudel015
  • 03-02-2022
  • Mathematics
contestada

a piece of work can be finished in 8 days, what part of the work is done in 2 days​

Respuesta :

kaseyafa
kaseyafa kaseyafa
  • 03-02-2022

Answer:

1/4 of the work

Step-by-step explanation:

A quarter (1/4) of the work is done in 2 days. Let's break it down:

Work can be finished in 8 days total so with 2 days it is only partially completed. If we set it up as 2/8 we can simplify to get 1/4. Therefore, we know only a quarter of the work is done so far.

Answer Link

Otras preguntas

After national boundaries were redrawn, which of the Central Powers lost access to the sea? A Austria-Hungary B Germany C The Ottoman Empire D Russia
math solve questions[tex]9 - \sqrt{y - 4 = 5} [/tex]​
which population had the greatest density?​
the volume of two similar solids are 1080cm and 1715cm .if the curved surface area of the smaller cone is 840cm .fond the curved surface area of the larger cone
Change wise, courageous,famous,proud,intelligent to abstract noun
Can someone help me out with this please and thank you
write Thirty-four thousand.six hundred fifty-two as a base ten number​
please help me ASAP When the Israelites ceased to worship and to serve God, He sent: locusts kings to lead them enemies to oppress them natural disasters
math solve questions​
Find the equation of the line that is parallel to the given line and passes through the given points Y=0.1 X -2;(-4,8) The equation is y= Please help it’s very