emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

in a volley ball is a player permitted to hit the ball twice consecutively​
A toy car is moving across a table with a velocity of 7.0 m/s and drives off the end. The table is 1.8 m tall. How long will the car be in the air before it cra
What is the value of five to the second power
(4 - 7m) - (-n + 2m - 1) pls helppp
How many 10’s are in 1000
-(1+7x)=6(-7-x)+36 Alg 2
Why is it important to collect all data during experiments, rather than make inferences of what will happen?
C. True or False? Select the best answer for each question. Write true or false in the space ________ 7. Everything you read online is either 100% false or 100%
here’s a graph of the equation x + 3y = 6 select all coordinates pairs that represent a solution to the equation A) 0,2 B) 0,6 C) 2,6 D) 3,1 E) 4,1 F 6,2
A hot–air balloon is moving at a speed of 10.0 meters/second in the +x–direction. The balloonist throws a brass ball in the +x–direction at a velocity of +4 met