Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

Write the ratio 7/8 :14 as a fraction in its simplest form
What is 2688 divided by 16
Zach, a high school junior, has just moved to a new town and cannot wait to get to school to meet new people. He likes sports and hopes he can try out for the s
Dave has two dogs. Riley is 1.7 years old, and bailey is 2.5 times older. How old is bailey ?
What is the change in elevation from 134 feet below sea level to 29 feet above sea level?
What does idk,ly and ttyl mean
Myths contribute to society by
increase 160km by 30%
Round 63.3 to the nearest tenth
Round this number 15,680